Zero
A detour will be implemented according to agreed schemes.

In Sumy region in connection with carrying out a complex of construction works during reconstruction of bridge crossing across the Vorskla river on motor road of General use of state importance N-12 “Sumy – Poltava” in the village Klimentovo drivers of all vehicles currently not able to travel through the bridge.

As UNIAN reported in service of highways in the Sumy region, from 3 to 6 may traffic through the bridge will be completely closed and a detour will be implemented according to agreed schemes across the Great Pysarivka and krasnopillia roads T-1705 “Lokhvytsia – Gadyach – Okhtyrka – CAT “Big Pisarevka” and R-45 “Sumy – Krasnopole – Bogodukhov”.

Work orders road Service in Sumy region holding company “Ammochostos”. Now the preparations continue for installation of the auxiliary beams with a length of 53 m, and also changes the perimeter of the construction site for the device of slopes.

“Soon, the main span of the bridge will be closed iron farms. During this complex process traffic through the bridge will be completely closed”, – stated in the message.

The existing bridge across the Vorskla river was built in 1964, its length is 171,65 m. At the first stage of reconstruction provides the construction of a new part of the bridge with a driveway clearance of 6 m for the organization of reverse motion of motor transport. The second stage involves the replacement of the superstructures of the existing parts and uniting the two parts of the bridge into a single structure.