Next week in Kiev will block shuliavska bridge

KIEV. March 4. UNN. On March 16, the Shulyavska overpass in Kiev will block in connection with the reconstruction. This was reported by the chief engineer of KP “Management of construction of road facilities in Kiev” Alexander Scolnik, reports UNN with reference to the press service of the KSCA.

“Since March 16, the Shulyavska overpass will block in connection with the reconstruction, the traffic will be arranged adjacent streets,” – said the press service with reference to Smolnica.

According to him, work on dismantling the existing crossover will be launched March 17. Until the end of the year, in particular, to complete work on the construction of a new overpass length 158,17 m bike lanes with a length of 741 m, left and right turn of congresses, the reconstruction of a pedestrian underpass, landscaping and gardening, said in KCSA.

See ALSO: Reconstruction Shulyavska bridge in Kyiv will cost UAH 400 million and will last one and a half years – the mayor

The traffic at this time would be arranged on adjacent streets.

“The traffic in the direction of Alexander Dovzhenko – and microstructure will occur along the streets of Anton Tzedeka and Peter Nesterov, exit on Victory Boulevard. On the intersection of Peter Nesterov and Victory Avenue arranged a temporary traffic light. Further – on Victory Avenue to the intersection with the street garmatna – at the intersection also gets a temporary traffic light to allow left turn on the street Garmatna. Then – on the street garmatna street Vyborg provided by exit on the street Vadym Hetman,” said Scolnik.

As for traffic in the direction Vadym Hetman – Alexander Dovzhenko, then the movement will occur the existing reconstructed exit at Victory Boulevard with the possibility of intersection of the Avenue and exit to the street Alexander Dovzhenko existing reconstructed by Congress.

In addition, the ways of detour of the organization of unilateral movement of road transport, namely: street Anton Tzedeka (up to intersection with Peter Nesterov) and ulitsa Petra Nesterova will switch to one-way traffic; Garmatnaya street (to the intersection with the street of Vyborg) and the street of the Vyborg also will switch to one-way traffic.

Trolleybus movement on the part of the Sevastopol area on the street Vadym Hetman will be the final stop “Industrial bridge”; from the streets of Helena Teligi street Alexander Dovzhenko – the final stop “Ul. Ivan Gonta”, added to the KSCA.

READ ALSO: IN Kiev postponed the reconstruction of the bridge shuliavska

In addition, the overlap time of the movement by Sulewski the overpass will be changes in public transport.

Thus, the movement of trolley buses of a route No. 22 is available as a trolleybus route № 22k “Airport” Kyiv “- str (Industrial overpass).

Movement of trolleybus No. 27 “Art. M. “pochayna “- yellow. the article “Kyiv-Volynskyi” is organized on two sections:

  • No. 27K: “Hall. St. Kyiv-Volyn – str (Industrial overpass)”;
  • No. 27A: “Art. M. “pochayna”- Degtyarevskaya str”.

The movement of a trolley bus № 30 in both directions is available on the track from St. Charles to the metro station “dorohozhychi” on their own the route, then St. Ilienko – metro station “Lukyanivska” – vozduhoflotskiy – Sevastopolskaya square next to St. Kadetskiy gay according to the current route.

In addition, the organized movement of temporary trolleybus route No. 30K “Ul. Miloslavskaya – Degtyarevskaya str”, and also organized the movement of temporary trolleybus route No. 21K “Ul. Cadet guy – str (Industrial overpass)”;

Movement of a trolleybus route № 42 “St. M.” Lybidskaya – Degtyarevskaya str “- as trolleybus route No. 42D “metro “Lybidskaya” – yellow. the article “Kyiv-Volynskyi”.

Also additionally organized the movement of the temporary bus route № 27TR “Ul. Degtyarevskaya – str (Industrial overpass)”.

According to the results of an approved scheme of traffic organization has made changes in the track of the movement of the bus № 2 “Str. Bulgakov – the street”.

In addition, it is planned to organise additional public transport in the area of crossing of streets of Dovzhenko and CEDICE, the intersection of a row and the prospectus of Victory and street of Hetman in the Industrial area of the overpass in the direction of the Sevastopol area.

To create favourable conditions for turning the trolley in the Industrial overpass is planned to move the stop on the street, which is located in the Industrial area of the overpass in the direction of Pobedy Ave., back in the direction of the Sevastopol area.

See ALSO: IN the capital Shulyavska overpass formed a pit: multiple cars damaged

We will remind, in October 2018 in the KSCA said that active work on repair of the Shulyavska overpass was supposed to begin in a few weeks, and by the end of December, the bridge had to be dismantled completely.